| SUMMARY |
|---|
|
|
|---|
This paper describes factors facilitating and working against successful community mobilization in the implementation of an integrated prevention programme for cardiovascular disease and lung cancer in four community settings in Québec, Canada. Implementation evaluation data from several sources showed that over the 3-year period, mobilization was partly achieved in all four communities, although the degree of success varied. The data support those of previous studies showing that several factors are key to effective intersectoral community mobilization: (i) involvement of concerned and influential community members with a commitment to shared goals and a visible community focus; (ii) formation of multi-organization systems among appropriate organizations, recognizing their strengths, resources and competencies, and preserving both their autonomy and interdependence with an appreciation of divergent perspectives; (iii) development of decision-making mechanisms through the setting up of formal structural arrangements to facilitate decisions with clear leadership; (iv) clear definition of objectives, tasks, roles and responsibilities; and (v) official support and legitimization from participating agencies, government authorities, and organizations with adequate resources devoted to partnership building. This study also replicated a number of barriers to the creation of sustainable intersectoral community mobilization, notably the potentially destructive role of power conflicts among the key institutional partners.
Key words: cardiovascular disease; community mobilization; health promotion; lung cancer
| INTRODUCTION |
|---|
|
|
|---|
Although the literature on intersectoral community mobilization is growing, field experiences with mobilization efforts in community health and disease prevention are sometimes fraught with frustration, delays and failures (Homonoff and Maltz, 1991
Implementation context
Aiming to reduce mortality from heart disease by 30% and to stabilize the incidence of lung cancer, the regional health authority covering the Québec City region of the province of Québec (Canada) in 1995 adopted the Québec Region Integrated Prevention Program for Cardiovascular Disease and Lung Cancer (QRIPPCDLC). The QRIPPCDLC received a time-limited funding allocation from the health authority for the period 19952002. The annual funding allocated for each of the four subregional projects varied between 53 000 and 75 000 Canadian dollars ($CDN), depending on population size. Using a
community mobilization approach within the region of the health authority, the programme aimed to support the adoption and maintenance of healthy behaviours in order to reduce the prevalence of the main five risk factors for cardiovascular disease and lung cancer.
The community mobilization approach adopted by the programme was grounded in the Ottawa Charter (1986) and more recent work on the ecological approach in health promotion (Green et al., 1996
), emphasizing community and environmental action as well as individual behaviour change. The mobilization of community stakeholders aimed first to sensitize key stakeholders to heart and lung health issues, and then to develop collaborative efforts to create activities and conditions favourable to health, conducted in the context of a new local dynamic around these health issues.
To achieve community mobilization, the regional health authority and the local community health centres (CLSCs) in each of four subregions were to become co-promoters of the subregional projects. (A fifth subregion was also involved, but adopted an intra-organizational programme for employees of the community health centre. Because the aims and approaches of this project differed so much from those of the other four, it will not be discussed further.) Community health centres offer a variety of front-line health and social services to the population of geographically defined territories. The populations and geography of the four subregions involved in the programmes were quite varied, as were their access to health and community resources. A summary of their characteristics is shown in Table 1
.
|
The two most rural regions, Charlevoix and Portneuf, were approached first by the regional health authority because of previous successful initiatives in rural areas. These regions were thus approved for funding 1 year before the other two. In all subregions, each project set its own objectives and established its programming as a function of the specific needs, priorities and resources in the local community. These variations in timing and process provide an excellent opportunity to examine how individual projects translated the overall programme objectives into specific initiatives and activities, as well as the factors that determined the relative success of the mobilization process. This paper describes the process of creating sustainable intersectoral community mobilization for the prevention of cardiovascular disease and lung cancer in these four settings, while identifying factors that contributed to and worked against the mobilization process.
| METHODS |
|---|
|
|
|---|
The data for this paper are drawn from implementation evaluations at four project sites, conducted at the end of the first, second and third years of the implementation period. The first evaluation was primarily descriptive. The subsequent evaluations aimed to assess the extent to which the project had been implemented successfully using criteria based on those developed in previous studies of community coalitions, partnerships and mobilization (Simmons et al., 1989
|
Data sources
The implementation evaluation data came from several sources: these are summarized below.
Year 1
Semi-structured telephone and face-to-face interviews conducted with 20 core working group members in the two first projects: Charlevoix and Portneuf.
Year 2
- Semi-structured telephone and face-toface interviews with 18 core working group members.
- Focus groups with working group members in all four communities.
- Structured questionnaires completed by all individuals involved in project implementation: (i) activities chart; (ii) continuous activities chart; and (iii) implementation process log.
- Records of partners contributions.
- Financial reports and expense records.
- Report on the annual regional meeting of all individuals involved in all four territories.
- Planning documents for each of the years covered.
- Meeting minutes and project notes supplied by local project workers.
Year 3
- Focus groups with working groups in all four communities.
- Semi-structured telephone interviews with three partners of each project (12 interviews).
- Structured questionnaires completed by all individuals involved in project implementation and reviewed during interviews: (i) activities chart; (ii) continuous activities chart; (iii) implementation process log.
Year 4
- Semi-structured telephone and face-toface interviews with 12 core working group members.
- Structured questionnaires completed by all individuals involved in project implementation: (i) activities chart; (ii) continuous activities chart; (iii) implementation process log.
- Planning documents for each of the years covered.
- Meeting minutes and project notes supplied by local project workers.
Data analysis
Verbatim transcriptions were made of all individual and group interviews. Qualitative analyses of all interview and documentary material aimed first to characterize the mobilization status of each of the projects, and then to identify explanatory factors. A meeting was held with each site to validate the results of these analyses. Finally, a horizontal analysis across all four sites was conducted in order to identify patterns and variations in the factors affecting mobilization success, in light of the theoretical models presented above. It is the results of the latter analyses that are presented below.
| RESULTS |
|---|
|
|
|---|
Implementation success according to the evaluation dimensions
The evaluation data show that over the 3-year period, implementation of the QRIPPCDLC was partly achieved in all four communities, although the degree of success varied. In the sections below, the overall results for each of the evaluation dimensions are presented, followed by the identification of factors that were found to enhance or work against the mobilization process. Table 3
|
Dimension 1: production of concerted and collaborative efforts to promote healthy behaviours and reduce modifiable risk factors
All the projects succeeded in mounting a large number of activities, with a stable capacity being reached in the third year of operations. The focus and targets of the activities varied greatly, with one community focusing on physical activity, another on tobacco and the two others with mixed interventions. In all the communities, however, the majority of interventions were focussed on improving individuals knowledge and behaviour. In two projects, about one-third of activities targeted the creation of health-promoting environments. In only one of the four was there a strong focus on improving access to formal and informal social support. Finally, only a very small number of activities aimed to improve integration of prevention into health professionals practice. Thus, overall it can be said that none of the projects developed the balanced, comprehensive intervention strategy recommended by the health authority based on the ecological approach.
Regarding the lack of mobilization efforts aimed at health professionals, the interview data suggested that at the local level, project workers found the process of community mobilization extremely time-consuming, especially given the ambitious objectives of the overall programme and the relatively limited resources available. Effective intervention with health professionals was seen as requiring specific, specialized resources and abilities, not currently available to projects. In addition, the health system was at that time undergoing major reform and downsizing, leaving all parties less available to work towards reducing barriers to preventive practice.
The interview data indicated that partners felt it was imperative for the projects to rapidly carry out their first community activities, in order to demonstrate the concrete aims of the local initiatives. Early successful activities then catalysed the mobilization of other partners and the emergence of new activities. Over and above the heart and lung health prevention objectives, these activities helped to enrich the social life of communities by creating new opportunities for social interaction.
Dimension 2: local coordination
In all four sites, local coordinating committees were created with representation from all partner sectors. A summary of the committees membership is shown in Table 4
.
|
In addition, each project had a number of collaborators involved in specific projects on a short-term basis. These often included local businesses, media, health professionals and community coalitions or organizations with other mandates (e.g. drug and alcohol abuse prevention, seniors advocacy).
Dimension 3: intersectoriality, community activation and partnership
The data presented above show that all projects created effective partnership that resulted in the conduct of many health promotion activities in their communities. In this sense, all the projects met the implementation evaluation criteria for community activation: convergence of interests among a group of stakeholders around the importance of heart and lung health; creation of an active working group or structure; and legitimization of the groups existence and actions by other opinion leaders in the community.
The evolution of stable and rewarding working relationships within the coordinating committees was an essential condition for projects to become active in carrying out activities and successfully mobilizing other community members. Although many of those involved were experienced in community development, they had not worked with health sector partners before on these particular issues. As one interviewee stated:
For myself, what I found difficult it was not mobilization, I already knew that! It was mobilization about physical health problems.
In one group, the implementation evaluation showed that the first year of operations was characterized by tension and dissension, to the point where partners were becoming demotivated. However, a clarification of roles in the second year led to the development of a more transparent working environment and the development of greater trust and collaboration. In another group, a fairly public conflict with a partner organization led the project to adopt a more behind-the-scenes mobilization strategy, thereby reducing its own visibility in the community.
The obstacle at the beginning was in the confrontation with the community group and the bringing in of new partners.
Interview data from the second implementation evaluation showed that partners were generally satisfied with their participation and with their roles in the conceptualization, planning and execution of the projects, as well as with the decision-making and management of the local coordinating committees. Partners perceived several advantages to participating in the projects, and were motivated to continue their participation.
The interview data also suggested that in all projects, the opportunity for partners to participate in the orientation, decision-making and financial management of the projects was essential to create a feeling of ownership and common interest. Frequent, regular meetings and effective communication strategies facilitated mobilization, as partners developed and maintained a sense of closeness to the project.
Development of partners mobilization capacity
Partners participation in the projects led in several cases to a gradual shift in the collective understanding of the projects mission away from being a public health-driven, short-term project and towards a community-driven initiative aimed at improving citizens quality of life:
Once we had started to do local heart health activities for the population, we began to realize that this was not only the public health department and the community health centres project, but also a local project for the populations well-being.
This shift may be an important step in enhancing both community capacity to ensure sustainability of heart and lung health promotion projects, as well as its community development capacities more generally.
Barriers and facilitators to partnership
The interviews with project partners conducted in the third year of implementation evaluation helped identify factors that served as facilitators and barriers to the partnerships. A summary of these is presented below.
Facilitating factors for the creation of a partnership
Central among facilitating factors was the mix of partners involved in the project, including their prior history of collaboration and their leadership and dynamism. As one respondent noted:
The fact we had already worked together before on other projects, that helped us begin this one on heart health.
At the outset, in gaining partner involvement, it was important for the promoting organization (the regional health authority in particular) to have adequate knowledge of the communitys resources, formal and informal communication networks, as well as of opinion leaders and other natural allies within the community. The credibility, visibility and influence power of partners in their communities then become important factors in the effectiveness of community mobilization, and led to the early creation of a local coordinating committee with decision-making authority. In this particular context, some types of partners were recognized as essential, e.g. a credible physician or municipal government representatives. The importance of the leadership role of the community health centre among the partners was recognized, as both a catalyser and a driver of the partnership. The constant presence of at least one representative of the community health centre on the coordinating committee was required for the groups to maintain a high level of effectiveness.
Another important set of factors had to do with the conditions and resources required to maintain partner involvement past their initial commitment. The development of a sense of belonging to the project was critical in this respect. However, the interviews revealed that organizational support was a strong determinant of continued involvement. The working group members needed a clear mandate from their organization to participate, as well as formal work time allotted to their involvement. The stability of partners representatives within the working group was also important.
Finally, the atmosphere and relationships within the partnership also created facilitating conditions. Progress was felt to be greatest when there was a climate of trust and openness in meetings, clear project objectives agreed to by all parties, and clear and transparent management practices, which support partners mobilization. Moreover, adaptation of the project to the needs expressed implicitly or explicitly by the project partners and collaborators showed a respect and willingness to accept others points of view.
Barriers to the creation of partnerships
Several of the barriers identified in the interview data were opposites of the facilitating factors highlighted. Among these was the mix of partners; in some projects, interviewees felt that the absence of certain key players impeded progress in implementing the programmes, or their generalizability or sustainability. In particular, the inadequate involvement of the health sector through poor representation from health professionals attributed to a lack of interest (theres not enough physicians that believe in prevention yet!) led to a lack of effort in targeting their practices and a lack of focus on prevention activities among physicians. Poor representation from the municipal sector led to difficulties in expanding the project to other municipalities.
Partners lack of experience in working with each other, and in particular in working with the health sector, was also a problem in some cases. The bureaucratic, centralizing style of the community health centre was a source of frustration for some partners.
The lack of a common vision of the project or conflicting agendas among partners was also cited as a barrier to progress. When there was a lack of clear definition of roles and function of the local coordinating committee, infrequent coordinating committee meetings and related lack of communication frustrated progress and led to attrition and demotivation. The lack of an explicit link between community mobilization and project sustainability also impeded the setting of long-term goals. In addition, the lack of feedback on project activities or results in terms of health behaviour change sometimes left partners without a sense of progress.
Investment by partners of human, financial and material resources
The evaluation conducted at the end of the second year of operations showed that partners tended to make one of three types of contributions to the project: (i) provision of staff hours for specific activities (e.g. nurses and physicians for multifactorial screening), for the equivalent of up to 5 days per year; (ii) lending of equipment and space, or provision of pamphlets or material; or (iii) publicizing the project and or its events in local media. One project was able to conduct a successful fund-raising campaign to support the conduct of a large community-wide event. In all cases, however, the contribution could be described as sporadic and activity-based, rather than as ongoing base support to project operations. The evaluation at the end of the second year confirmed that projects were not yet sustainable without the ongoing financial contribution of the regional health authority.
Intersectoriality, citizen and community-based group involvement
The previous section provided a summary of the composition of local coordinating committees, which shows that all projects were highly intersectoral, meeting the evaluation criteria of involvement of at least three sectors. In addition, all projects involved community-based groups as either partners or collaborators, and one had formal representation from citizens on its coordinating committee.
While the presence of volunteers was recognized as crucial to both project operations and sustainability, it also raised some issues about partnership between non-remunerated and unofficial individuals, and duly mandated and remunerated representatives of public and other agencies. While some projects were able to deal with the issue through recognition of different types of expertise brought to the project table, for others the debate remains.
It was suggested that more formal association of the project with strong and credible community-based organizations would be helpful in ensuring sustainability. The organization could then become the focal point for local heart and lung health activities.
Dimension 4: promoters roles and responsibilities
The evaluation conducted at the end of the second year of operation identified some problems in the roles and relationships adopted by the two main promoters of the projects: the public health department of the regional health authority and the local community health centre. In one case, differing visions of the roles seemed to result from a lack of clarification about principles of joint ownership of the project. In another, there was resistance among the local health centre staff to allocating prevention resources to physical health issues when both curative services and social issues seemed to be more pressing. A third project also faced resistance, in part because the implementation of the provincial anti-smoking law within the local community health centre was attributed to the project, and in part because of an already acrimonious relationship with the regional health authority. However, in one other project, the division of responsibility between the two seemed to be harmonious and complementary. Overall, it was concluded that the lack of consensus regarding the relevance of this type of programme to the mission and priorities of the community health centres posed a particular challenge.
At the end of the second year, this tension persisted and was in fact exacerbated by the ongoing health system reform, which has tended to reinforce the local health centres role in curative services, particularly post-hospitalization services and home care.
| CONCLUSION |
|---|
|
|
|---|
The implementation evaluations of the regional heart disease and lung cancer prevention programme have replicated previous studies of community health mobilization initiatives and provide at least partial support for existing models. The findings of the evaluation emphasize the importance of process factors in the creation and maintenance of effective partnerships.
Key requirements to enhance local partners appropriation of heart health preventive actions are the roles played by local host agencies and the partners involvement in planning and implementation of heart and lung health activities. Local appropriation by key individuals and groups appears to be the first step to generate concerted actions between the local partners, and to prepare them to act for community change in support of the emergence of innovative health initiatives. Our data support those of previous studies showing that the following factors are key to effective intersectoral community mobilization.
- Involvement of concerned and influential community members with commitment to shared goals (Homonoff and Maltz, 1991
) and a visible community focus (Nutbeam, 1994
).
- Formation of multi-organization systems among appropriate organizations, recognizing their strengths, resources and competencies (Simmons, 1989
), preserving both their autonomy and interdependence with an appreciation of divergent perspectives (Homonoff and Maltz, 1991
).
- Development of decision-making mechanisms, through the setting up of formal structural arrangements to facilitate decisions (Simmons, 1989
) with clear leadership (Nutbeam, 1994
).
- Clear definition of objectives, tasks, roles and responsibilities (Simmons, 1989
; Nutbeam, 1994
).
- Official support and legitimization from participating agencies, government authorities and organizations (Homonoff and Maltz, 1991
), with adequate resources devoted to partnership building (Kegler et al., 1998
).
This study also replicated a number of barriers to the creation of sustainable intersectoral community mobilization. Important among these was the potentially destructive role of power conflict, especially among the key institutional partners. Other studies have shown how such conflicts can play themselves out within the larger network of partnerships, thereby effectively paralysing mobilization efforts. For example, in analysing the implementation processes for the Boson Healthy Start initiative, Plough and Olafson indicate that the greatest difficulties were encountered with the sharing of power between the mainstream health agency involved and the community partners, and an ensuing conflict over the very nature and intents of the project [(Plough and Olafson, 1994
), p. 229]. Similarly, Speroff et al. state:
... agencies and groups need to leave their competition and confrontation outside to keep participation at the grassroots level of the community. [(Speroff et al., 1998), p. 700]
As public health agencies move closer to adopting a community mobilization perspective on heath promotion, especially around health issues that do not seem to capture public concern and activism, they will need to ensure that the above conditions are in place. In the present project, the overall success of the implementation of the heart and lung health promotion programmes attest to the capacities of public health agencies and community partners to work together in creating sustainable, effective initiatives.
| ACKNOWLEDGEMENTS |
|---|
The authors wish to thank the community actors (practitioners, administrators and decision makers) who actively participated in the evaluation process. We would also like to thank Mr Michel Beauchemin, coordinator of the Lifestyle Habits and Chronic Disease team at the Regional Public Health Authority, Quebec Region, and the other members of the team. J. B. would especially like to thank Dr Gilles Paradis for his encouragement and unfailing support of her young career as a researcher.
| REFERENCES |
|---|
|
|
|---|
Baker, E., Melton, R., Strange, P., Fields, M., Koplan, J., Guerra, F. et al. (1994) Health reform and the health of the public: forging community health partnerships. Journal of the American Medical Association, 272, 12761282.
Cameron, G. and Cadell, S. (1999) Fostering empowering participation in prevention programs for disadvantaged children and families: Lessons from ten demonstration sites. Canadian Journal of Community Mental Health, 18, 105121.
Capek, S. (1992) Environmental justice, regulation and the local community. International Journal of Health Services, 22, 729746.
Eng, E. and Parker, E. (1994) Measuring community competence in the Mississippi Delta. Health Education Quarterly, 21, 199220.[Web of Science][Medline]
Fawcett, S., Paine-Andrews, A., Francisco, V., Schultz, J., Richter, K., Lewis, R. et al. (1995) Using empowerment theory in collaborative partnerships for community health and development. American Journal of Community Psychology, 23, 677697.[Web of Science][Medline]
Green, L. W., Richard, L. and Potvin, L. (1996) Ecological foundations of health promotion. American Journal of Health Promotion, 10, 270281.[Web of Science][Medline]
Homonoff, E. and Maltz, P. (1991) Developing and maintaining coordinated system of community-based services to children. Community Mental Health Journal, 27, 347358.[CrossRef][Web of Science][Medline]
Kegler, M., Steckler, A, McLeroy, K. and Malek, S. (1998) Factors that contribute to effective community health promotion coalitions: a study of 10 Project ASSIST coalitions in North Carolina. American Stop Smoking Intervention Study for Cancer Prevention. Health Education and Behaviour, 25, 338353.
Labonte, R. and Roberston, A. (1996) Delivering the goods, showing our stuff: the case for a constructivist paradigm for health promotion research and practice. Health Education Quarterly, 23, 431447.[Web of Science][Medline]
Nutbeam, D. (1994) Intersectoral action for health: making it work. Health Promotion International, 9, 143144.
ONeil, M., Lemieux, V., Groleau, J., Fortin, J. and Lamarche, P. A. (1997). Coalition theory as a framework for understanding and implementing intersectoral health-related interventions. Health Promotion International, 12, 7987.
Parker, R. (1996) Empowerment, community mobilization and social change in the face of HIV-AIDS. AIDS, December (Suppl. 3), S27S31.
Person, B. and Cotton, D. (1996) A model of community mobilization for the prevention of HIV in women and infants. Prevention of HIV in women and Infants Demonstration Project. Public Health Reports, 111 (Suppl. 1), 8998.[Web of Science][Medline]
Plough, A. and Olafson, F. (1994) Implementing the Boston Healthy Start Initiative: a case study of community empowerment and public health. Health Education Quarterly, 21, 221234.[Web of Science][Medline]
Rachlis, M. Intersectoral Action Workshop: Background paper and evaluation report. Health Canada, October 1999, p. 22.
Scott, C. and Thurston, W. (1997) A framework for the development of community health agency partnerships. Canadian Journal of Public Health, 88, 416420.[Web of Science][Medline]
Simmons, J., Salisbury, Z., Kane-Williams, E., Kaufman. C. and Quaintaince, B. (1989) Interorganizational collaboration and dissemination of health promotion for older Americans. Health Education Quarterly, 16, 529550.[Web of Science][Medline]
Speroff, T., Miles, P. and Mathews, B. (1998) Improving health care, part 5: applying the Dartmouth clinical improvement model to community health. Journal of Quality Improvement, 24, 66796703.
Treno, A. and Holder, D. (1997) Community mobilization: evaluation of an environmental approach to local action. Addiction, June (Suppl. 2), S173S187.[CrossRef]
World Health Organization, Health and Welfare Canada, and Canadian Public Health Association. (1986) Ottawa Charter for Health Promotion. Canadian Journal of Public Health, 77, 425430.[Medline]
![]()
CiteULike
Connotea
Del.icio.us What's this?
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||